Production of Coal Mines
Problem Statement Solutions Outcome

Dip in Coal Production.

Dip in average machine utilization.

Contributed to let  Amelia team to improve monthly coal production through better equipment utilization and mine planning. 

Contributed in implementing better methodology and thechnologies to reduce the  mining cost through better utilization of heavy earth moving equipment at the mine.

Contributed in Designing  and implementing the Operations and Maintenance strategy of the Super Critical Power plant to achieve significantly better efficiency and plant availability parameters. Digitised monitoring of Operations and Maintenance of the Super Critical Power plan.

Average Equipment Utilizaton went from 12 hrs/day to 19 hrs/day.

Monthly coal production increased by 240%

Reduce the cost(Rs)/ton of coal mined at Amelia north by 21%



Coal Mine Coal Production Equipment utilization